Saturday, July 13, 2013

Colour and Electrical appointments

We had our colour selection on 26th of march 1.30pm - 5.00pm. It was exhausting our brains were still buzzing after the electrical which went over budget. They didn't have our correct drawing just the standard plan even though we added most structural changes through SC. We did have to mention about couple of upgrade options instead of the other way around. Although we had visited Hopetoun several times before the appointment it took us more than  3 hours to finalize everything. Felt a bit rushed in the end, but the colour consultant was helpful and did provide contact details if we wanted to change anything within 48 hour or was it 24 . We were able to make some important changes and things we missed through CC instead of waiting for the BC to respond. which wasn't good at the beginning.
 
Posted by Picasa
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 

 
 
 

 
 
 

No comments: